Moblie

Tuesday, March 11, 2014

Cisco Nexus Switch Bacis Steps

Nexus 7K Basic Steps for Implementation  

 1. Archive the License File .lic into .tar in same Nexus Switch.
 2. Backup the License file in tftp server.
 3. Check the License period and grace period.
 4. Before enable the feature (like FCOE) check the license type in Feature and license set.
 5. Check the power redundant mode option and apply the power mode.